pull down to refresh
250 sats \ 2 replies \ @DarthCoin 19h \ on: Stacker Saloon
The roof is ready !
Next week will cover it with water-isolation and the green level (gravel, dirt, grass)
Well done! How long did it take to haul those boards out there?
reply
I was impressed by myself how fast you could put the wood boards.
I started at 7:30AM and at 11:30AM was done.
Yes, I used an electrical machine (Black'n'Decker) for screws that I also was impressed by its battery durability.
Now comes the hard part, bringing lots of gravel and dirt buckets on top. I have to do it in the morning when is still not so hot. Afternoons are for beers in the river and relax.
Now I am really satisfied with this roof. Is strong and well done. I can even jump on it. I used 50cm distance between the beams and that is giving a lot of pressure point for the boards, having 3 points of support. And the beams are quite heavy, between 15 and 20cm diameter.
I waited so long for this important day. Having a proper roof is very important.
reply