pull down to refresh
54 sats \ 0 replies \ @kurszusz 1 Aug \ on: Amtrak Wraps Up Pile Driving Phase of Seattle Rail Yard Modernization Project Construction_and_Engineering
I've never seen such a large pile-up...I don't think I ever will...but I've been lucky enough to see a smaller one (the piles of a solar park with a capacity of about 30 MW). That was also a cool thing!