pull down to refresh
103 sats \ 3 replies \ @Undisciplined 16 Apr \ on: Closed Loop Thinking vs Open Loop Thinking mostly_harmless
Fellow open looper here.
I like to think about this in terms of the 80-20 principle. We can get five projects to 80% in the same time a closed looper gets one project done.
In a lot of cases, 80% is good enough, anyway, so we're basically 5x as productive.