pull down to refresh

UPDATE:

https://informedinfrastructure.com/96320/pcl-construction-stantec-selected-for-rehab-and-expansion-of-international-wastewater-treatment-plant-at-us-mexico-border/

Contractor selected PCL construction and Stantec to design.

Total cost is $600M a design-build project