pull down to refresh

The project operates at about 3 megawatts (MW) of mining capacity and is planned as a 24-month proof of concept. Its goal is not only to demonstrate technical feasibility but also to collect data that can help determine whether the model can scale to larger agricultural or industrial applications.

Instead of typical air-cooled mining machines, the system uses liquid-cooled servers from Canaan’s Avalon series. Around 360 mining units are installed and connected to a closed-loop heat exchange system that transfers heat into the greenhouse’s water-based heating infrastructure.

I know there have been a ton of pilots in this area, but I'm surprised it hasn't taken off yet.

some territories are moderated