The local utility cannot deliver at peak without curtailment. reliability and continuous and maximum peak
Wulf is based in Maryland???
reply
Not sure
reply
pull down to refresh
The local utility cannot deliver at peak without curtailment. reliability and continuous and maximum peak
Wulf is based in Maryland???
Not sure
Smart play: a shuttered 401-MW smelter brownfield arrives with the hard part already done — substation capacity, transmission rights and years of public buy-in, which are the real bottleneck for AI campuses. The irony: it's the same playbook miners use on old coal and smelter sites (cheap power, existing grid taps), just pointed at an AI tenant instead. The thing to watch is whether the local utility can actually deliver 401 MW at peak without curtailment — that's usually where these deals get stuck.