This work was carried out between Monday and Tuesday, involving a 4 kW inverter, two 12-volt batteries, and four solar panels.
the metal structure for mounting the panels
the mounted panels (4 in total)
This metal base is being fabricated for the two batteries.
the 2 batteries mounted and connected
in the process of making the connections and checking the inverter's operation
This is the final product—this is how it turned out. All that was missing were some plastic cable covers to improve the look, but unfortunately, they are out of stock.
This work was carried out between Monday and Tuesday, involving a 4 kW inverter, two 12-volt batteries, and four solar panels.
the metal structure for mounting the panels
the mounted panels (4 in total)
This metal base is being fabricated for the two batteries.
the 2 batteries mounted and connected
in the process of making the connections and checking the inverter's operation
This is the final product—this is how it turned out. All that was missing were some plastic cable covers to improve the look, but unfortunately, they are out of stock.