pull down to refresh

Nearly all industrial scale miners shut down their rigs in Texas while the state experienced a severe power crunch during the record heat wave in early July.
While the power crunch sent electricity prices soaring and made Bitcoin mining operations unprofitable, some large-scale miners such as Riot were able to sell electricity purchased earlier at a lower price back to the grid with a premium.
Riot is participating in the 4 Coincident Peak program from the state power operator known as the Electric Reliability Council of Texas. Riot’s 750-megawatt Whinstone Facility in Rockdale, Texas, is curtailing consumption when called during the four summer months of peak energy demand.
Here's a similar article on this on CoinDesk, shared here on SH:
Riot Blockchain Mined 28% Less Bitcoin in July as Heat Wave Cut Power Supply #53924 https://www.coindesk.com/business/2022/08/03/riot-blockchain-mined-28-less-bitcoin-in-july-as-heat-wave-cut-power-supply/ https://archive.ph/X4IHJ <-- An archive, which can be easier to read
reply
reply