pull down to refresh
11 sats \ 2 replies \ @k00b 11 Dec 2024 \ on: What are you working on this week? meta
- ek finished receive wallet fallbacks and I reviewed that
- optimizing our pathfinding (we have lots of low quality channels so it can be really slow routing for large amounts)
- lots of little UX/edge stuff for wallets tumbling around in my head
- I'm continuing my work on cowboy credits (all done by satistics overhaul and some config)
deleted by author
reply

reply