from article:
The facility, located in an unpopulated area, is fully constructed and operational. The 51 MW capacity could support approximately 2.9 EH/s of hashrate output using Bitmain’s Antminer S21 Pro equipment.
According to the company, the site benefits from a reliable power supply sourced from the grid at an average cost of $0.03 per kilowatt-hour (kWh), a rate that, if accurate, is competitive in the industry.
add:
https://pro.theminermag.com/overview/bitcoin-production-cost-estimate