pull down to refresh
29 sats \ 2 replies \ @Rothbardian_fanatic 22 Mar \ parent \ on: A 6-month road repair that only takes 10 days, at a fraction of the cost? Construction_and_Engineering
It is just the maintenance that is never ending. Our roads here will never be very good due to the freezing and thawing of the water on the roads in fall and spring. They need to repair them every year.
It's just a Tom Woods joke for the "Who will build the roads?" people.
reply
Ok, I just haven’t seen the joke. I know that the question is the same from the thoroughly brainwashed crowd.
reply