pull down to refresh
151 sats \ 0 replies \ @kurszusz 10 May \ on: Kiewit wins 4,236 BTC Design-Build contract for Port Arthur, TX flood control Construction_and_Engineering
This is really expensive, but it is worth it if it is effective and really protects.
Without protection, in the event of a major flood, the damage would be much greater than 5k BTC