pull down to refresh
165 sats \ 0 replies \ @kurszusz 31 May \ on: DC Water's Potomac River Tunnel Project to begin controlled underground blasting Construction_and_Engineering
This is another project where construction costs are secondary (not primary)...it is much more important that the wastewater does not end up in places where it can endanger others. All this if we think long-term, and not only think about ourselves, but also about the generations that will come after us...