pull down to refresh

5m long and 20-30cm diameter. Even that were dead fallen trees and somekind of dry, were still heavy. Never thought that will be so hard to carry some logs. I could say that from the whole project (digging the hole, building with bags etc)... this was the heaviest one. No joking, no bullshit. I am fucking tired. Every muscle is a pain today. I've lost 2kg only in these 2 days carrying those logs. Insane!